TECHNICAL FIELD
The present invention relates to a permanent magnet molding apparatus
for sequentially transferring a plurality of metal die units filled with powder
of magnet molding material and forming molded permanent magnet products by pressurizing
the powder of the magnet molding material in the metal die units and magnetizing
the powder while applying a magnetic field in a direction perpendicular to a pressurizing
direction.
BACKGROUND ART
Although not illustrated, a conventional permanent magnet molding
apparatus is generally so constructed as to fill powder of magnet molding material
into a cavity of a metal die unit including a die, in which the cavity is formed,
and a punch located against the die and to pressurize the powder of the magnet molding
material with the punch while magnetizing the powder by applying a magnetic field
to the powder by means of a pair of coils situated in a surrounding area of the
metal die unit, as disclosed in Japanese Laid-open Patent Publication No. H7-115030,
for example.
In the conventional permanent magnet molding apparatus constructed
as described above, a molded permanent magnet product is taken out of the metal
die unit when finished and the powder of the magnet molding material is filled in
the emptied cavity. Since permanent magnet products are produced one after another
by repeating such product removal and powder filling cycles in successive turns,
it is necessary to interrupt magnetizing and pressurizing operations while the powder
of the magnet molding material is being filled, causing a deterioration in productivity.
In addition, since the powder of the magnet molding material is filled in an area
where the magnetic field is applied, there have been a problem that there occur
variations in the amount of the filled powder of the magnet molding material, resulting
in a reduction in reliability.
This invention has been made to solve the aforementioned problem and,
accordingly, it is an object of the invention to provide a permanent magnet molding
apparatus capable of achieving an improvement in productivity and reliability.
DISCLOSURE OF THE INVENTION
A first permanent magnet molding apparatus of this invention includes:
- a transferable metal die unit including a die having a cavity of a desired cross-sectional
shape in which magnet molding material powder is filled, the cavity extending in
groovelike form in a specific direction on a surface of the die, a lid member placed
against a facing surface of the aforementioned die as if covering the aforementioned
cavity, and a pair of punches having the same cross-sectional shape as the aforementioned
cavity, the aforementioned punches being positioned to fit in the aforementioned
cavity such that the punches close the aforementioned cavity at both ends thereof,
and the punches being made slidable in directions in which the punches go into contact
with and become separated from the magnet molding material powder;
- pressurizing means for holding the metal die unit which has been transferred
with the aforementioned magnet molding material powder filled in the aforementioned
cavity and for pressurizing the aforementioned magnet molding material powder by
driving the aforementioned two punches such that the aforementioned two punches
slide in their approaching directions; and
- magnetic field generating means for magnetizing the magnet molding material
powder pressurized in the aforementioned cavity while applying a'magnetic field
thereto in a direction perpendicular to a direction of pressurization.
In this construction, it is possible to provide a permanent magnet
molding apparatus which makes it possible to achieve an improvement in productivity
and reliability.
A second permanent magnet molding apparatus of this invention differs
from the aforementioned first permanent magnet molding apparatus in that the aforementioned
magnetic field generating means includes a pair of yokes located on an upper surface
of the lid member and on a bottom surface of the die of the aforementioned metal
die unit and a coil wound around at least one of the aforementioned yokes, wherein
the aforementioned yokes are movable in directions along the aforementioned facing
surface of the lid member and the die of the aforementioned metal die unit.
In this construction, it is possible to hold the yokes in close contact
with the metal die unit so that a large and uniform magnetizing field is produced.
A third permanent magnet molding apparatus of this invention differs
from the aforementioned second permanent magnet molding apparatus in that the aforementioned
pair of yokes are attracted by each other and sandwich the aforementioned lid member
and die to press against the aforementioned facing surface when the aforementioned
coil is actuated.
In this construction, it is made unnecessary to provide complicated
structure or large-sized equipment for pressing the facing surface.
A fourth permanent magnet molding apparatus of this invention differs
from the aforementioned first permanent magnet molding apparatus in that the aforementioned
metal die unit has a gap of 0.01 to 0.1 mm in part of the aforementioned facing
surface.
In this construction, gas in the cavity can be smoothly discharged,
so that cracks and external defects on a molded product are reduced.
A fifth permanent magnet molding apparatus of this invention differs
from the aforementioned first permanent magnet molding apparatus in that the aforementioned
metal die unit has a base frame on which the aforementioned die is located and the
aforementioned pair of punches has pushing parts at one end which are pressed by
the aforementioned pressurizing means and caused to slide on the aforementioned
base frame while being guided along the extending direction of the aforementioned
cavity.
In this construction, it is possible to provide a permanent magnet
molding apparatus which makes it possible to achieve an improvement in productivity.
A sixth permanent magnet molding apparatus of this invention differs
from the aforementioned fifth permanent magnet molding apparatus in that the aforementioned
pressurizing means is a pair of cylinders situated along the extending direction
of the aforementioned cavity, wherein pistons of the aforementioned cylinders extend
face to face with end surfaces of the pushing parts of the aforementioned punches
to push the aforementioned pushing parts, causing the aforementioned punches to
slide in their mutually approaching directions.
In this construction, it is possible to provide a permanent magnet
molding apparatus which makes it possible to achieve a cost reduction, not to mention
an improvement in productivity.
A seventh permanent magnet molding apparatus of this invention differs
from the aforementioned fifth permanent magnet molding apparatus in that the seventh
permanent magnet molding apparatus further includes a grasping member which engages
with the aforementioned base frame, wherein the aforementioned grasping member fits
slidably in the extending direction of the aforementioned cavity and the aforementioned
lid member is forced against the aforementioned die and held in position via a locking
mechanism between the aforementioned base frame and the aforementioned grasping
member.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve a further improvement
in productivity.
An eighth permanent magnet molding apparatus of this invention differs
from the aforementioned seventh permanent magnet molding apparatus in that the aforementioned
grasping member is divided into two portions in its sliding direction.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve a further improvement
in productivity.
A ninth permanent magnet molding apparatus of this invention differs
from the aforementioned first permanent magnet molding apparatus in that the aforementioned
metal die unit has a base frame on which the aforementioned die is located and the
aforementioned pair of punches has pushing parts at one end which are pushed by
the aforementioned pressurizing means and caused to slide on the aforementioned
base frame while being guided along the extending direction of the aforementioned
cavity, the aforementioned pushing parts having rotatably mounted rollers.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve an improvement in productivity.
A tenth permanent magnet molding apparatus of this invention differs
from the aforementioned ninth permanent magnet molding apparatus in that the aforementioned
pressurizing means has first guiding surfaces for guiding the aforementioned rollers
and second guiding surfaces formed immediately adjacent to the respective first
guiding surfaces, wherein the distance between the aforementioned second guiding
surfaces is smaller than the distance between the aforementioned first guiding surfaces
and the aforementioned second guiding surfaces press against the aforementioned
rollers, causing the aforementioned punches to slide in their mutually approaching
directions.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve a further cost reduction,
not to mention an improvement in productivity.
An eleventh permanent magnet molding apparatus of this invention differs
from the aforementioned ninth permanent magnet molding apparatus in that the eleventh
permanent magnet molding apparatus further includes a grasping member which engages
with the aforementioned base frame, wherein the aforementioned grasping member fits
slidably in the extending direction of the aforementioned cavity and the aforementioned
lid member is forced against the aforementioned die and held in position via a locking
mechanism between the aforementioned base frame and the aforementioned grasping
member.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve a further improvement
in productivity.
A twelfth permanent magnet molding apparatus of this invention differs
from the aforementioned eleventh permanent magnet molding apparatus in that the
aforementioned grasping member is divided into two portions in its sliding direction.
According to this construction, it is possible to provide a permanent
magnet molding apparatus which makes it possible to achieve a further improvement
in productivity.
BRIEF DESCRIPTION OF THE DRAWINGS
- FIG. 1 is a plan view showing the construction of a permanent magnet molding
apparatus according to a first embodiment of this invention;
- FIG. 2 shows the construction of a metal die unit of FIG. 1, in which (A) is
a plan view and (B) is a front view;
- FIG. 3 is a sectional diagram showing a cross section taken along lines V-V
of FIG. 2;
- FIG. 4 is a sectional diagram showing a cross section taken along lines VI-VI
of FIG. 2;
- FIG. 5 is a sectional diagram showing a cross section taken along lines III-III
of FIG. 1;
- FIG. 6 is a diagram showing earlier and later stages of a process of manufacturing
the permanent magnet molding ' apparatus of FIG. 1;
- FIG. 7 is a plan view showing the construction of a permanent magnet molding
apparatus according to a second embodiment of this invention;
- FIG. 8 is a sectional diagram showing a cross section taken along lines VIII-VIII
of FIG. 7;
- FIG. 9 shows the construction of a metal die unit shown in FIG. 7, in which
(A) is a plan view and (B) is a front view;
- FIG. 10 is a sectional diagram showing a cross section taken along lines X-X
of FIG. 9;
- FIG. 11 is a sectional diagram showing a cross section taken along lines XI-XI
of FIG. 9;
- FIG. 12 is a plan view showing the construction of a metal die unit of a permanent
magnet molding apparatus according to a third embodiment of this invention;
- FIG. 13 is a sectional diagram showing a cross section taken along lines XIII-XIII
of FIG. 12;
- FIG. 14 is a sectional diagram showing a cross section taken along lines XIII-XIII
of FIG. 12, particularly showing a construction different from the construction
of FIG. 13;
- FIG. 15 is a diagram showing the operation of grasping members provided in a
metal die unit of a permanent magnet molding apparatus according to a fourth embodiment
of this invention;
- FIG. 16 is a sectional diagram showing the construction of a permanent magnet
molding apparatus according to a fifth embodiment of this invention;
- FIG. 17 is a sectional diagram illustrating the operation of the permanent magnet
molding apparatus of the fifth embodiment of this invention;
- FIG. 18 is a sectional diagram illustrating the operation of the permanent magnet
molding apparatus of the fifth embodiment of this invention; and
- FIG. 19 is a (a) plan view, (b) front view and (c) side view showing a metal
die unit of the permanent magnet molding apparatus of the fifth embodiment of this
invention.
BEST MODES FOR CARRYING OUT THE INVENTION
Individual embodiments of the present invention are described in the
following with reference to the drawings.
FIRST EMBODIMENT
FIG. 1 is a plan view showing the construction of a permanent magnet
molding apparatus according to a first embodiment of this invention, FIG. 2 shows
the construction of a metal die unit of FIG. 1, in which (A) is a plan view and
(B) is a front view, FIG. 3 is a sectional diagram showing a cross section taken
along lines V-V of FIG. 2, FIG. 4 is a sectional diagram showing a cross section
taken along lines VI-VI of FIG. 2, FIG. 5 is a sectional diagram showing a cross
section taken along lines III-III of FIG. 1, and FIG. 6 is a diagram showing earlier
and later stages of a process of manufacturing the permanent magnet molding apparatus
of FIG. 1.
The permanent magnet molding apparatus of this embodiment includes
a second belt conveyor 2 for transferring metal die units 7 filled with powder of
magnet molding material, a fourth belt conveyor 5 for transferring the metal die
units 7 in which the filled powder of the magnet molding material has already been
shaped, a mounting base 12 placed between the second belt conveyor 2 and the fourth
belt conveyor 5, a first cylinder 15, a second cylinder 16, coils 21, 22 mounted
on the mounting base 12, pressurizing cylinders 17, 18 and guide plates 13, 14 for
guiding the metal die units 7 as shown in FIG. 1.
The first cylinder 15 is provided for moving the metal die unit 7
filled with the powder of the magnet molding material from the second belt conveyor
2 to a position where the pressurizing cylinders 17, 18 pressurize the powder, whereas
the second cylinder 16 is provided for moving the metal die unit 7 in which the
powder of the magnet molding material has been shaped and magnetized. Each of the
metal die units 7 moves, guided by the guide plates 13, 14.
As shown in FIGS. 2, 3 and 4, the metal die unit 7 includes a base
frame 8 formed of a first member 8a having a U-shaped cross section and second members
8b each having a rectangular parallelepiped shape affixed to four corners of the
first member 8a, a die 9 situated at a central part of the base frame 8, the die
9 having a cavity 9a of a groovelike shape formed in a surface of the die 9 up to
end surfaces thereof along a specific direction and the cavity 9a having the same
cross-sectional shape as a molded permanent magnet product 6, a lid member 10 positioned
on the die 9 to cover the cavity 9a, and a pair of punches 11 each having a pushing
part 11a at one end and a shaping part 11b having the same cross-sectional shape
as the cavity 9a at the other end. Sliding on the base frame 8 and between both
members 8a, 8b of the base frame 8, the pushing parts 11a are guided along the extending
direction of the cavity 9a. The shaping parts 11b fit in the cavity 9a and slide
in such a way that the shaping parts 11b close the cavity 9a at both ends thereof.
The mounting base 12 is formed into a rectangular cross-sectional
shape as shown in FIG. 5. The pressurizing cylinders 17, 18 and the pair of coils
21, 22 serving as magnetic field generating means are fixed to the mounting base
12. Serving as pressurizing means, the pressurizing cylinders 17, 18 are arranged
along the extending direction of the cavity 9a in the metal die unit 7 which has
been brought to a specific position by the first cylinder 15. When the pressurizing
cylinders 17, 18 operate, their pistons thrust pushrods 20. The pushrods 20 slide
along guide members 19 and thrust the pushing parts 11a of both punches 11, causing
the two punches 11 to slide in directions approaching to each other. The coils 21,
22 are magnetic field generating means which apply a magnetic field to the magnet
molding material powder 3 in the die 9 pressurized via the two punches 11 in a direction
perpendicular to a pressurizing direction to magnetize the magnet molding material
powder 3 in the direction perpendicular to the pressurizing direction.
Operation of the permanent magnet molding apparatus constructed as
described above is now explained below referring to the drawings.
First in the earlier manufacturing stage, a specific amount of the
magnet molding material powder 3 suited to the size of the cavity 9a in the die
9 is extracted at a position shown by an arrow "a" onto a first belt conveyor 1
as shown in FIG. 6(A). Next, after the magnet molding material powder 3 is charged
into the cavity 9a at a position shown by an arrow "b," the magnet molding material
powder 3 is brought into a thoroughly uniform state at a position shown by an arrow
"c." Next, at a position shown by an arrow "d," the cavity 9a is closed by covering
the top of the die 9 with the lid member 10. Then, the metal die unit 7 of which
cavity 9a has been filled with the magnet molding material powder 3 is transferred.from
the first belt conveyor 1 to the second belt conveyor 2.
Subsequently, the metal die unit 7 transferred onto the second belt
conveyor 2 moves on the second belt conveyor 2 in the extending direction of the
cavity 9a along an arrow "a" shown in FIG. 1. When the metal die unit 7 reaches
a position corresponding to the first cylinder 15, the metal die unit 7 stops as
it is forced against an unillustrated pin or block-shaped positioning jig. As the
first cylinder 15 begins to operate, its piston extends and pushes out the halted
metal die unit 7 in a direction shown by an arrow "b" intersecting the extending
direction of the cavity 9a along the two guide plates 13, 14, causing the metal
die unit 7 to move up to a line interconnecting the two pressurizing cylinders 17,
18.
Next, as the two pressurizing cylinders 17, 18 begin to operate, their
pistons extend and push the pushing parts 11a of the two punches 11 constituting
part of the metal die unit 7 from both sides. Consequently, the shaping parts 11b
are caused to move in the cavity 9a in directions of arrows "c" and "d" pointing
to each other up to a point where end surfaces of the shaping parts 11b are positioned
face to face at a specific distance from each other. At this time, the magnet molding
material powder 3 in the cavity 9a is in a state of being pressed at a specific
force. Then, the two coils 21, 22 are activated in this state, so that the magnetic
field is applied to the magnet molding material powder 3 in the direction perpendicular
to the pressurizing direction and the magnet molding material powder 3 is magnetized.
When magnetization of the magnet molding material powder 3 is finished,
the two coils 21, 22 stops to operate. Subsequently, after performing a demagnetizing
process by applying a reverse magnetic field, the pistons of the two pressurizing
cylinders 17, 18 contract and return to their original positions, becoming separated
from the metal die unit 7. Then, the second cylinder 16 begins to operate and its
piston extends and reaches the location of the metal die unit 7. Consequently, although
not discussed in detail here, after a sucking pad provided at a far end of the piston,
for example, has sucked a side surface of the base frame 8 of the metal die unit
7, the piston contracts and returns to its original state as shown by an arrow "e"
and sucking condition is released, whereby the metal die unit 7 is transferred onto
the fourth belt conveyor 5.
The metal die unit 7 transferred onto the fourth belt conveyor 5 moves
in the direction of an arrow "f" on the fourth belt conveyor 5 opposite to the moving
direction of the second belt conveyor 2 as shown in FIG. 1.
The metal die unit 7 which has moved in the direction of the arrow
"f" on the fourth belt conveyor 5 is transferred onto a third belt conveyor 4 shown
in FIG. 6(B) and the later manufacturing stage is carried out. Specifically, after
the lid member 10 of the metal die unit 7 is removed, at a position of an arrow
"e," the molded permanent magnet product 6 is removed from the cavity 9a at a position
of an arrow "f" as shown in FIG. 6(B). Then, after the metal die unit 7 including
the interior of the cavity 9a is cleaned at a position of an arrow "g," each successive
metal die unit 7 is returned back to the first belt conveyor 1 shown in FIG. 6(A)
for recirculation. On the other hand, although not illustrated, the molded permanent
magnet product 6 taken out of the cavity 9a is subjected to a post processing step,
such as sintering, to produce a finished permanent magnet.
While pre-processing steps are being performed on the first belt conveyor
1, another metal die unit 7 is supplied from the second belt conveyor 2 onto the
mounting base 12 of the permanent magnet molding apparatus and subjected to magnetizing
and pressurizing operations.
Cleaning of the metal die unit 7 involves removal of the magnet molding
material powder 3 adhering to the die 9, the lid member 10 and the punches 11 by
use of a brush or a piece of cloth, for instance. It is possible to prevent scoring
on the metal die unit 7 in a succeeding molding process by removing the magnet molding
material powder 3.
Also, die lubricant is applied to the die 9, the lid member 10 and
the punches 11 as necessary and excessively applied die lubricant is wiped off by
a piece of cloth, for instance. It is possible to prevent scoring on the metal die
unit 7 and reduce release resistance of the molded permanent magnet product 6 by
applying the die lubricant.
According to this first embodiment, the metal die unit 7 is constructed
of the base frame 8, the die 9, the lid member 10 and the pair of punches 11 so
that the metal die unit 7 can be transferred as described above.' After filling
the magnet molding material powder 3 in the cavity 9a of the die 9 and closing the
lid member 10 beforehand in the earlier manufacturing stage on the first belt conveyor
1, the metal.die unit 7 is.transferred by the second belt conveyor 2 and the first
cylinder 15 to the position where the two pressurizing cylinders 17, 18 are located,
and the molded permanent magnet product 6 is formed by pressing the magnet molding
material powder 3 in the cavity 9a by moving the two punches 24 of the metal die
unit 7 in their mutually approaching directions with the two pressurizing cylinders
17, 18 while applying the magnetic field to the magnet molding material powder 3
to magnetize it by the two coils 21, 22. Then, the metal die unit 7 is transferred
from the fourth belt conveyor 5 onto the third belt conveyor 4 and, after the molded
permanent magnet product 6 is removed from the cavity 9a on the third belt conveyor
4, the metal die unit 7 is returned back to the first belt conveyor 1 for successive
recirculation. Since the magnetizing and pressurizing operations can be performed
without interruption even when the magnet molding material powder 3 is being filled
in this way, it is possible to achieve an improvement in productivity.
Furthermore, since the magnet molding material powder 3 is filled
into the cavity 9a on the first belt conveyor 1 where the magnetic field is not
generated, no variations occur in the amount of the magnet molding material powder
3 filled. This makes it possible to achieve an improvement in reliability.
Moreover, since the pair of pressurizing cylinders 17, 18 is used
as the pressurizing means to perform the pressurizing operation with a simple structure,
it is also possible to achieve a cost reduction.
SECOND EMBODIMENT
FIG. 7 is a plan view showing the construction of a permanent magnet
molding apparatus according to a second embodiment of this invention, FIG. 8 is
a sectional diagram showing a cross section taken along lines VIII-VIII of FIG.
7, FIG. 9 shows the construction of a metal die unit shown in FIG. 7, in which (A)
is a plan view and (B) is a.front view, FIG. 10 is a sectional diagram showing a
cross section taken along lines X-X of FIG. 9, and FIG. 11 is a sectional diagram
showing a cross section taken along lines XI-XI of FIG. 9.
In these Figures, portions similar to those of the aforementioned
first embodiment are designated by the same reference numerals and their description
is omitted here.
The apparatus of this embodiment is not provided with pressurizing
cylinders like those of the aforementioned .first embodiment but is provided with
first guiding surfaces 26a, 27a and second guiding surfaces 26b, 27b formed on pressurizing
platelike members 26, 27 as pressurizing means.
A guiding width continuously varies from the first guiding surfaces
26a, 27a such that the guiding width between the second guiding surfaces 26b and
27b formed on the pressurizing platelike members 26, 27 becomes narrower than the
guiding width between the first guiding surfaces 26a and 27a. The pressurizing platelike
members 26, 27 are positioned such that a narrow width portion between the second
guiding surfaces 26b and 27b is located at a central position of a magnetic field
formed by the two coils 21, 22.
As shown in FIGS. 9 to 11, a metal die unit 23 includes a base frame
8, a die 9, a lid member 10 and a pair of punches 24 each having a shaping part
24b of which one end has the same cross-sectional shape as a cavity 9a and slides
and fits into the cavity 9a as if closing the cavity 9a at both ends as in the aforementioned
first embodiment. Unlike the aforementioned first embodiment, however, each of the
punches 24 has a pushing part 24a in which a roller 25 is located an opposite end.
Sliding on the base frame 8 and between both members 8a, 8b of the base frame 8,
the pushing parts 24a are so constructed as to be guided along the extending direction
of the cavity 9a.
The two rollers 25 of the metal die unit 23 transferred on the second
belt conveyor 2 are positioned opposite to each other. The two rollers 25 are constructed
such that the distance between end surfaces of the shaping parts 24b is larger than
the length of a molded permanent magnet product 6 shown by 1 (el) in FIG. 11 when
opposite sides of both curved outer surfaces of the two rollers 25 are separated
from each other by the same distance as the distance between the first guiding surfaces
26a and 27a. Also, the two rollers 25 are constructed such that the distance between
the end surfaces of the shaping parts 24b becomes equal to the length of the molded
permanent magnet product 6 shown by 1 (el) in FIG. 11 when the distance between
the opposite sides of both curved outer surfaces of the two rollers 25 becomes equal
to the distance between the first guiding surfaces 26a and 27a.
Operation of the permanent magnet molding apparatus of the second
embodiment constructed as described above is now explained below referring to the
drawings.
First, the metal die unit 23 of which cavity 9a has been filled with
magnet molding material powder 3 in an earlier manufacturing stage is transferred
from the first belt conveyor 1 to the second belt conveyor 2 as in the first embodiment.
Then, as shown in FIG. 7, the metal die unit 23 moves on the second belt conveyor
2 in the extending direction of the cavity 9a along an arrow "a," and when the metal
die unit 23 reaches a position corresponding to the first cylinder 15, the metal
die unit 23 stops as it is forced against an unillustrated positioning jig. At this
point, the first cylinder 15 begins to operate so that its piston extends and pushes
out the halted metal die unit 23 in a direction shown by an arrow "b" intersecting
the extending direction of the cavity 9a along the individual first guiding surfaces
26a, 27a of the two pressurizing platelike members 26, 27.
When the locations of the individual rollers 25 of the metal die unit
23 reach the individual second guiding surfaces 26b, 27b of the two pressurizing
platelike members 26, 27, the two punches 24 are pushed in their mutually approaching
directions via the rollers 25 since the distance between the second guiding surfaces
26b and 27b is made narrower than the distance between the first guiding surfaces
26a and 27a. Consequently, the individual shaping parts 24b move in the cavity 9a
and their end surfaces are positioned face to face with each other at a specific
distance. At this time, the magnet molding material powder 3 in the cavity 9a is
in a state of being pressed at a specific force. Then, the two coils 21, 22 are
activated in this state, so that the magnetic field is applied to the magnet molding
material powder 3 in the direction perpendicular to the pressurizing direction and
the magnet molding material powder 3 is magnetized.
When magnetization is finished, the two coils 21, 22 stops to operate.
Subsequently, after performing a demagnetizing process by applying a reverse magnetic
field, the second cylinder 16 begins to operate and its piston extends and reaches
the location of the metal die unit 23. Then, although not discussed in detail here,
after a sucking pad provided at a far end of the piston, for example, has sucked
a side surface of the base frame 8 of the metal die unit 23, the piston contracts
and returns to its original state as shown by an arrow "e" and sucking by the sucking
pad is released, whereby the metal die unit 23 is transferred onto the fourth belt
conveyor 5 and moves in the direction of an arrow "f" on the fourth belt conveyor
5. Then, in a manner similar to the first embodiment, the molded permanent magnet
product 6 is removed from the cavity 9a in a later manufacturing stage performed
on the third belt conveyor 4 and, although not illustrated, subjected to a post
processing step, such as sintering to produce a finished permanent magnet.
After the molded permanent magnet product 6 is removed from the cavity
9a, the metal die unit 23 is cleaned and then returned back to the first belt conveyor
1 for successive recirculation. While pre-processing steps are being performed on
the first belt conveyor 1, another metal die unit 23 is supplied from the second
belt conveyor 2 onto the mounting base 12 of the permanent magnet molding apparatus
and subjected to magnetizing and pressurizing operations.
According to this second embodiment, the metal die unit 23 is constructed
of the base frame 8, the die 9, the lid member 10 and the pair of punches 11 so
that the metal die unit 23 can be transferred as described above. After filling
the magnet molding material powder 3 in the cavity 9a of the die 9 and closing the
lid member 10 beforehand in the earlier manufacturing stage on the first belt conveyor
1, the metal die unit 23 is transferred by the second belt conveyor 2 and the first
cylinder 15 to a position between the two pressurizing platelike members 26, 27
and fed to the narrow width portion between the second guiding surfaces 26b and
27b. Consequently, the two punches 24 of the metal die unit 23 are caused to move
in their mutually approaching directions, and the molded permanent magnet product
6 is formed by pressing the magnet molding material powder 3 in the cavity 9a while
applying the magnetic field to the magnet molding material powder 3 to magnetize
it by the two coils 21, 22. Then, the metal die unit 23 is transferred from the
fourth belt conveyor 5 onto the third belt conveyor 4 and, after the molded permanent
magnet product 6 is removed from the cavity 9a on the third belt conveyor 4, the
metal die unit 7 (sic) is returned back to the first belt conveyor 1 for successive
recirculation. Since the magnetizing and pressurizing operations can be performed
without interruption even when the magnet molding material powder 3 is being filled
in this way, it is possible to achieve an improvement in productivity.
Furthermore, since the magnet molding material powder 3 is filled
into the cavity 9a on the first belt conveyor 1 where the magnetic field is not
generated, no variations occur in the amount of the magnet molding material powder
3 filled. This makes it possible to achieve an improvement in reliability.
Moreover, the individual second guiding surfaces 26b, 27b of the two
pressurizing platelike members 26, 27 are used as pressurizing means to guide the
metal die unit 23 along the individual second guiding surfaces 26b, 27b and perform
the pressurizing operation by moving the two punches 24. Since no source of motive
power, such as a pressurizing cylinder, for directly forcing the punches 24 is required
and maintenance is not necessary, it is possible to achieve a further cost reduction.
Although the metal die unit 7 is brought in and out in the same direction
as shown by the arrows "b" and "e" in FIG. 1 and by the arrows "b" and "e" in FIG.
7 in the foregoing first and second embodiments, the metal die unit 7 may be brought
in and out in opposite directions to return the metal die unit 7 to its original
position.
Furthermore, although the apparatus is constructed such that the direction
of pressurization by the pressurizing cylinders 17, 18 and the pressurizing platelike
members 26, 27 serving as the pressurizing means intersects the directions in which
the metal die unit 7 is brought in at right angles, the invention is not limited
to this construction. It is possible to obtain the same advantageous effect even
if the apparatus is constructed such that the pressurization direction matches the
directions in which the metal die unit 7 is brought in.
Additionally, while the invention has been described with reference
to a case where the magnetic field generating means is constructed of the pair of
coils 21, 22, it is needless to say that the magnetic field generating means may
be constructed of only one of the coils 21, 22 or a permanent magnet.
THIRD EMBODIMENT
FIG. 12 is a plan view showing the construction of a metal die unit
of a permanent magnet molding apparatus according to a third embodiment of this
invention, FIG. 13 is a sectional diagram showing a cross section taken along lines
XIII-XIII of FIG. 12, and FIG. 14 is a sectional diagram showing a cross section
taken along lines XIII-XIII of FIG. 12, particularly showing a construction different
from the construction of FIG. 13.
In these Figures, portions similar to those of the aforementioned
first embodiment are designated by the same reference numerals and their description
is omitted here.
As shown in FIGS. 12 and 13, a base frame 28 is formed into a U-shaped
cross section and a die 9 covered with a lid member 10 is placed at a central part
of the base frame 28. There are formed locking grooves 28a, 28b in both side surfaces
of the base frame 28. A grasping member 29 is situated on the base frame 28 to hold
the lid member 10. The grasping member 29 has at its both ends bent portions 29a,
29b extending along both side surfaces of the base frame 28 and there are formed
locking jaws 29c, 29d at extreme ends of the bent portions 29a, 29b. Constituting
a locking mechanism 30 together with the locking grooves 28a, 28b, the locking jaws.29c,
29d mate with the two locking grooves 28a, 28b. The grasping member 29 made slidable
on the base frame 28 in an extending direction of a cavity 9a with the aid of the
locking mechanism 30.
According to this third embodiment, the lid member 10 is held by the
grasping member 29 which can slide on the base frame 28 along the extending direction
of the cavity 9a with the aid of the locking mechanism 30 as described above, so
that the lid member 10 can be fitted and removed simply by moving the grasping member
29 along the extending direction of the cavity 9a. Therefore, it is possible to
facilitate a step of filling magnet molding material powder 3 into the cavity 9a
and a step of removing a molded permanent magnet product 6 out of the cavity 9a
and thereby achieve an improvement in productivity.
While the locking mechanism 30 is constructed of the two locking grooves
28a, 28b in the base frame 28 and the two locking jaws 29c, 29d of the grasping
member 29 in the construction of FIG. 13, there may be provided rollers 31 fitted
on the extreme ends of the bent portions 29a, 29b instead of the locking jaws 29c,
29d. The provision of the rollers 31 serves to smoothen sliding motion of the grasping
member 29 and further facilitate fitting and removal of the lid member 10.
FOURTH EMBODIMENT
FIG. 15 is a diagram showing the operation of grasping members of
a metal die unit of a permanent magnet molding apparatus according to a fourth embodiment
of this invention.
In this Figure, portions similar to those of the aforementioned third
embodiment are designated by the same reference numerals and their description is
omitted here.
As shown in FIG. 15(A), the grasping member 29 of the aforementioned
third embodiment is divided into two portions along the extending direction of a
cavity 9a to form a pair of grasping members 32, 33 in this embodiment. There are
formed chamfered portions 32a, 33a on facing side surfaces of the individual grasping
members 32, 33. The two grasping members 32, 33 are forced out as pushing members
34 are driven into a gap between the chamfered portions 32a and 33a as shown in
FIG. 15(B), and the top of a lid member 10 is opened as shown in FIG. 15(C).
According to this fourth embodiment, the lid member 10 is held by
the pair of half-split grasping members 32, 33 as described above, so that the lid
member 10 can be fitted and removed simply by forcing out the two grasping members
32, 33 and moving them toward both sides of a base frame 28. It is therefore possible
to achieve an improvement in productivity as in the third embodiment.
FIFTH EMBODIMENT
FIG. 16 is a sectional diagram showing a cross section of a principal
part of a permanent magnet molding apparatus according to a fifth embodiment of
this invention, FIGS. 17 and 18 are sectional diagrams illustrating the operation
of the apparatus of FIG. 16, FIG. 19 is a (a) plan view, (b) front view and (c)
side view showing a metal die unit of the permanent magnet molding apparatus.
In these Figures, portions similar to those of the aforementioned
first embodiment are designated by the same reference numerals and their description
is omitted here.
In this fifth embodiment, there are provided yokes 35 made of a ferromagnetic
material on which coils 21, 22 are wound and the individual yokes 35 are made movable
up and down by air cylinders 36 fixed to a mounting base 12 as shown in FIG. 16.
Operation of the permanent magnet molding apparatus constructed as
described above is now explained below referring to the drawings.
As in the aforementioned first embodiment, a metal die unit 7 of which
cavity has been filled with magnet molding material powder 3 in an earlier manufacturing
stage is transferred by individual belt conveyors and fed in such a manner that
a central position of the metal die unit 7 is located at a central position of the
yokes 35 as shown in FIG. 17(a).
The metal die unit 7 used in this fifth embodiment does not require
any grasping member for pressing a lid member against a die unlike the aforementioned
third or third embodiment.
Next, the metal die unit 7 is sandwiched by the individual yokes 35
by actuating the individual air cylinders 36 and a inagnetizing field is generated
by the coils 21, 22 as shown in FIG. 17(b).
When this magnetizing field occur, there occurs an attractive force
between the individual yokes 35, whereby facing surfaces of the die and the lid
member of the metal die unit 7 are forced against each other and the magnet molding
material powder in the metal die unit 7 is magnetized by the magnetizing field.
The air cylinders 36 may be of a type having a capability to lift
the individual yokes 35 and there is no need for such equipment that can produce
a large force like hydraulic cylinders.
Next, under conditions where the magnetizing field is being generated,
the magnet molding material powder in the metal die unit 7 is compressed to form
a molded product by actuating pressurizing cylinders 17, 18 in arrow directions
and pushing punches 11 as shown in FIG. 17(a).
In the metal die unit 7, there is formed a gap 37 of about 0.01 mm
to 0.1 mm between the die 9 and the lid member 10 in part of their facing surfaces
as shown in FIG. 19. Gas, such as air or inert gas, remaining in empty spaces in
the metal die unit 7 or the magnet molding material powder is smoothly discharged
through the gap 37. If gas remains in the empty spaces in the metal die unit 7 or
the magnet molding material powder, cracks may occur in a molded permanent magnet
product since the gas once compressed expands, for instance, when pressurization
by the punches 11 is released. With the provision of the gap 37, however, the gas
in the metal die unit 7 is smoothly discharged, so that a molded permanent magnet
product free of defects like cracks is obtained.
Next, the pressurizing.cylinders 17, 18 are actuated in reverse directions
shown by arrows as shown in FIG. 17(b) to release pressure exerted on the punches
11. Although pressurizing force (residual stress) applied to the molded permanent
magnet product is released a little at this time, the metal die unit 7 remains to
be pressed by the yokes 35. Therefore, the residual stress in the molded permanent
magnet product remains almost unchanged due to friction between wall surfaces of
a cavity 9a of the metal die unit 7 and the molded product.
Subsequently, the magnetizing field produced by the coils 21, 22 is
cut off and the yokes 35 are moved upward and downward as shown by arrows by the
air cylinders 36. Since the pressurizing force applied to the lid member 10 and
the die 9 of the metal die unit 7 is removed and the residual stress in the molded
permanent magnet product is uniformly released simultaneously at this time, cracks
and external defects would not easily occur.
Then, in a manner similar to the first embodiment, the molded permanent
magnet product is removed from the cavity in a later manufacturing stage performed
on the third belt conveyor and, although not illustrated, subjected to a post processing
step, such as sintering to produce a finished permanent magnet.
According to this fifth embodiment, the yokes 35 are held in close
contact with the metal die unit 7 as seen above, so that a large and uniform magnetizing
field is produced.
Also, the metal die unit 7 is supplied to a position between the yokes
35 and the metal die unit 7 is pressed by producing the attractive force between
the yokes 35 by the magnetizing field of the coils 21, 22, it is possible to eliminate
the need for large-sized equipment like hydraulic cylinders for pressing the lid
member of the metal die unit 7 against the die or a complicated structure for pressurizing
the metal die unit 7.
In addition, because the residual stress in the molded permanent magnet
product in the metal die unit 7 is uniformly released at the same time when the
magnetizing field is cut off and the pressurizing force applied to the metal die
unit 7 is removed, cracks and external defects are unlikely to occur.
While the foregoing discussion of the fifth embodiment has illustrated
a case where the coils 21, 22 are wound around the pair of yokes 35, a single coil
may be wound around one of the pair of yokes 35.
Also, while the foregoing discussion has illustrated an example in
which the pressurizing cylinders are used as a source of motive power, motors may
be used as instead of the pressurizing cylinders.
INDUSTRIAL APPLICABILITY
This invention is intended for use in the manufacture of permanent
magnets used in rotating electric machines such as motors.